○ Total Ore Reserve: 30.6 Mt, containing 3.5 Mt of magnetite concentrate and ~21,100 tonnes of zircon.
○ Construction sand by-product: 15.2 Mt contained within Probable Reserves.
○ Proved Reserves derived from the pilot pit area with close-spaced drilling; Probable Reserves from broader Indicated Resources.
○ Inferred Resources are excluded from the Reserve statement in compliance with JORC (2012).
• Commitment of up to USD 11.2 million from Pacific Unison to fund construction and commissioning
• PLC retains 100% equity ownership of the Project and 50% of all future profits
• Pacific Unison leads the required funding, construction and development of the OBP and also receives 50% of future profits
• Targeted commencement of production is 30 June 2026, with an annual output target of 500,000 tonnes of Magnetite